School Operations

Last changed on Wed, 12/31/1969 - 18:00
gdp-dc0017-0319-001
Topic
School Operations
Summary
Regarding the specifications for a standard steel storage tank including details of construction and workmanship.
gdp-dc0017-0312-001
Topic
School Operations
Summary
Regarding the water supply and details the capacity of the wells, the consumption of water, water needed by the school, a report from the Kelly Well Company, and a form of invitation for bids.
gdp-dc0017-0320-001
Topic
School Operations
Summary
This drawing illustrates how frost casing bolted to a tank for a water tower riser pipe.
gdp-dc0017-0322-001
Topic
School Operations
Summary
Regarding drawings of tunnel to be built.
gdp-dc0017-0321-001
Topic
School Operations
Summary
Regarding the immediate appropriation for the purchase and erection of a water tank.
gdp-dc0017-0311-001
Topic
School Operations
Summary
Regarding the need for a new water system for the school due to cave-ins from soft sand around the well.
gdp-dc0017-0310-001
Topic
School Operations
Summary
Regarding a recommendation to arrange a new water supply due to the danger of a cave-in which will cut off the water supply.
gdp-dc0017-0309-001
Topic
School Operations
Summary
Regarding the construction of two wells after the caving in of earth around the school.
gdp-dc0017-0305-001
Topic
School Operations
Summary
Regarding the request to connect the school's water supply with the town's in case of fire.
gdp-dc0017-0255-001
Topic
School Operations
Summary
Regarding a proposal for a wooden tank and inability to quote on a steel tank.