Browse Digital Heritage

Search

Sort

Format

gdp-dc0017-0200-001
Topic
School Operations
Summary
Regarding the inability to install a steel tank due to size of tank.
gdp-dc0017-0211-001
Topic
School Operations
Summary
Regarding the returning of a certified check for the fabrication and erection of the elevated steel tank.
gdp-dc0017-0212-001
Topic
School Operations
Summary
Regarding the request to receive the formal contract to cover the fabrication and erection of the replacement job for the steel tank.
gdp-dc0017-0041-001
Topic
School Operations
Summary
Regarding the request of $1,996 for miscellaneous operating expenses.
gdp-dc0017-0213-001
Topic
School Operations
Summary
Regarding the authorization of a steel tank for the school.
gdp-dc0017-0305-001
Topic
School Operations
Summary
Regarding the request to connect the school's water supply with the town's in case of fire.
gdp-dc0017-0309-001
Topic
School Operations
Summary
Regarding the construction of two wells after the caving in of earth around the school.
gdp-dc0017-0310-001
Topic
School Operations
Summary
Regarding a recommendation to arrange a new water supply due to the danger of a cave-in which will cut off the water supply.
gdp-dc0017-0321-001
Topic
School Operations
Summary
Regarding the immediate appropriation for the purchase and erection of a water tank.
gdp-dc0017-0311-001
Topic
School Operations
Summary
Regarding the need for a new water system for the school due to cave-ins from soft sand around the well.
gdp-dc0017-0322-001
Topic
School Operations
Summary
Regarding drawings of tunnel to be built.
gdp-dc0017-0262-001
Topic
School Operations
Summary
Regarding the figures and dimensions for the construction of a water well.