Browse Digital Heritage

Search

Sort

Format

gdp-dc0017-0064-001
Topic
School Operations
Summary
Regarding the sending of photographs of building in the course of construction.
gdp-dc0017-0096-001
Topic
School Operations
Summary
Regarding an appropriation being transferred to the Santee School and cancelled.
gdp-dc0017-0075-001
Topic
School Operations
Summary
Regarding improvements and facilities for agricultural instruction and the request for recommendations.
gdp-dc0017-0086-001
Topic
School Operations
Summary
Regarding repairing the floors in the kitchen and dining room with terrazzo or similar material.
gdp-dc0017-0011-001
Topic
School Operations
Summary
Regarding the blueprints of stock designs.
gdp-dc0017-0044-001
Topic
School Operations
Summary
Regarding an overdraft of $2,443.60 in available funds.
gdp-dc0017-0034-001
Topic
School Operations
Summary
Regarding the a report on the school's boilers, water, power, and heating.
gdp-dc0017-0013-001
Topic
School Operations
Summary
Regarding the placing of deflectors on the windows.
gdp-dc0017-0046-001
Topic
School Operations
Summary
Regarding two requests for transfer from the disciplinarian and the matron due to a situation in the large boys' building.
gdp-dc0017-0036-001
Topic
School Operations
Summary
Regarding an inspection report noting the boys' dormitory for repair.
gdp-dc0017-0014-001
Topic
School Operations
Summary
Regarding the deflector boards installed in six school rooms.
gdp-dc0017-0026-001
Topic
School Operations
Summary
This floor plan details the dimensions of each room in the attic, the locations of doors, windows, and vents as well as the number of boys in each room.